OFFSHORE
Windpark Fryslan, worlds largest inner lake wind farm HSSE representative for the owner during ITT, design, selection, pre-kwalification and construction including amongst others the 55 km export cable and substation.
Egmond aan Zee, OWEZ, strategic support to the owners.
Windpark Westermeerwind HSSE representative for the owner during ITT, design, selection, pre-kwalification, construction and Operation & Maintenance.
Samsung Heavy Industries, turbine Design Review and risk assessments, management framework, training and coaching wind turbine manufacturing. Installation support test turbines and onshore and offshore wind measureing masts.
Global incident and accident investigation on renewable maritime heavy equiument.
Darwind HSE support in the development of a new offshore wind turbine. This involved the development of a tailor made HSE management system for the design, manufacturing, sales, construction and operation phase. HSE aspects of the design were also covered, involving the specification of detailed design work processes, a number of design risk assessment workshops, etc.
Senvion (previously known as REpower) Supporting activities for roll out of new offshore platform into the European markets, ensuring the new wind turbine was compliant with all local country HSE legislation and requirements. Creation of elaborate overviews of the key aspects of local the local HSE framework. Global market entry studies.
Projects overview
Germany
- Butendiek
- DanTysk
- Trianel (Borkum West II)
- EnBW Baltic 1
- EnBW Baltic 2
The Netherlands
- Windpark Fryslan
- Egmond aan Zee (OWEZ)
- Westermeerwind
- Prinses Amaliawindpark
- Luchterduinen
Belgium
- Belwind
- North Sea Power
- Norther
- Eldepasco
United Kingdom
- Kentish Flats
- Scroby Sands
- Robin Rigg
- Barrow
- North Hoyle
- West Isle of Wight
ONSHORE
Procter & Gamble Providing HSE support during the ground preparation, foundation, and erection & commissioning works of an onshore wind turbine on a high risk location in Coevorden on factory grounds of Procter & Gamble.
Eneco Support in the preparation, implementation of contractor requirement, pre-qualification and risk management management documentation for several international onshore wind projects. The preparation of wind turbine specific tender requirements for the negotiation teams of Eneco.
Samsung Heavy Industries Principal risk management contractor in the build of an onshore and offshore wind measurement mast in Scotland (Methil).
Outsmart Supporting activities in the build of several onshore wind farms throughout the Netherlands for several of their clients.